How to tell a dam wall raise from new construction in satellite imagery

Every irrigation district audit turns up the same puzzle on a handful of properties: a storage that's bigger than what's on the licence, sitting where a storage has sat for twenty years. Before you book a site visit, you need to settle one question: is this a wall that's been pushed up a metre and a half, or a dam that was bulldozed flat and rebuilt on a slightly different footprint. The two get handled differently once an inspector's involved, so it pays to get the call right from the desk.
Why the distinction matters for the licence register
A wall raise on an existing, licensed storage is usually a capacity amendment question: did the holder lodge a works approval before lifting the crest, and does the new volume sit inside their entitlement. A new build with no prior licence history is a different conversation, closer to an unauthorised take. Mix the two up and you either chase paperwork for a variation nobody applied for, or let an unlicensed structure sit another twelve months because the file reads like routine maintenance.
The visual cues that separate a raise from a new build
Start with the footprint against the oldest clear image you can pull for that parcel. A raised wall keeps the same basin outline and the same spillway position, just with a wider, taller embankment and a visibly higher waterline pushing the shoreline out along the existing contour. The wall itself reads thicker in plan view, because raising a wall almost always means widening the base to carry the extra height, not just adding freeboard on top of the old crest.
A new build shows up differently. Look for a footprint that didn't exist at all in the earlier pass, often with a construction scar around it: cleared vegetation in a wider ring than the wall needs, spoil heaps or borrow pits nearby, haul tracks running in from the nearest gate. Freshly placed fill reads lighter in RGB than an established, grassed-over embankment, without the grass texture breaking up the surface, and that contrast tends to hold for a season or two after the works finish.
Check the batter angle and crest width too. A wall that's been raised in stages often shows a benched profile under close inspection, a faint shadow line partway up the embankment where the original crest used to sit before the new lift went on. A wall built in one pass is usually a single consistent slope from toe to crest, no step in it anywhere.
Spillway geometry is worth a look on its own. Raising a wall without touching the spillway is common enough, plenty of holders don't think a lift needs a separate approval, and that mismatch (taller wall, same old spillway capacity) is itself worth flagging on the file. A genuinely new dam almost always comes with a spillway cut to match the new storage, so an outsized spillway relative to the basin can point the other way, toward something planned as new construction from the start rather than an incremental lift.
Where photo-interpretation runs out
None of this replaces the licence file. A wall that reads as raised in imagery still needs the works approval history pulled before you write anything up, because a legitimate capacity increase with paperwork behind it isn't a compliance matter at all. A structure that looks new from the air might turn out to be a relocated dam approved years ago under a different scheme name. Imagery narrows the list of properties worth a look. The register still has to confirm what you're seeing.
That sorting job is what Farm Dam Detection is built for: a yearly pass over the catchment that flags storages sitting outside the current licence register, so the desk review happens before the ute leaves the yard, not after.
Worth setting up a catchment pass before the next audit cycle starts.