Field notes: the irrigator who built the dam in three stages

You see this one every audit cycle, usually on a property that's otherwise clean on paper. The licence register shows a modest farm dam, approved years ago, well under whatever volume trigger your catchment management plan sets for notification. Drive past it today and you'll find something considerably bigger. Not a different structure, just the same one, extended.
The pattern is almost always the same three moves. First the original dam, built to spec, correctly licensed, nothing to flag. A season or two later, the wall gets pushed out along one side, widening the storage without touching the spillway or the original footprint enough to look like a new work. Then, often not until the following wet season has filled it twice, a second extension squares off the far corner. Each stage, taken alone, sits just under the threshold that would have required a new application or a notification to your office. Taken together, the storage has roughly doubled, sometimes tripled, and none of it ever crossed your desk.
I don't think most of this is cunning in the way we sometimes assume. Plenty of it is an irrigator doing what irrigators have always done: building capacity when they have the machinery on site and the ground is dry enough to work, a few cubic metres at a time, across however many years it takes to get the storage they wanted. Nobody set out to dodge the trigger. They just never hit it, because nobody was measuring the cumulative change, only the last approved plan.
That's the part that makes this hard to catch with the tools most offices still rely on. A single aerial flyover, even a good one, tells you what the dam looks like today against what the file says it should look like. It doesn't tell you there were three distinct construction events, two years apart, each one small enough to read as maintenance. By the time a visible mismatch prompts a site visit, the irrigator has a perfectly reasonable explanation for the current footprint and no memory at all of when exactly the second stage went in. Nobody's lying to you. Nobody has to.
Stack three or four annual passes over the same storage and the staging shows up on its own. A sequence of passes shows the wall's position changing year over year, which reads very differently to a single snapshot checked once against the licence file. The wall that was 40 metres long in one year's imagery is 55 metres in the next, then 68 the year after. That's a construction record, not a resolution artifact or a seasonal fill difference.
It also changes who you send out. A district-wide flyover treats every property the same and burns a field day on dams that haven't moved in a decade. A flagged shortlist, built from the properties where this year's footprint doesn't match last year's or the licence file, puts your inspector at the one gate that needs a visit, with the stage history already in hand when they knock.
This is the exact gap Farm Dam Detection was built to close: a yearly satellite layer that holds the current footprint of every storage in your catchment against both the licence register and the prior year's pass, so a staged build shows up as a growing discrepancy rather than three separate non-events.
If you've got a property on your patch that's been "the same dam" for six years running, it might be worth seeing what six years of imagery say.