Field notes: the catchment where every dam on the register was ten years out of date

A dirt farm track forking near gum trees in dry open paddock country under a partly cloudy sky.

I drove out to this catchment in March for what was meant to be a routine entitlement check, three properties flagged on the complaints log, nothing more. By the second gate I knew the morning was going to run long.

The first property had a dam that wasn't on the register at all. Not an expansion, not a modification, a full structure sitting in a gully that the aerial from the last statewide capture showed as bare paddock. When I asked the landholder about it he said it had been there "a fair while," which turned out to mean 2016. Nobody had applied for anything. Nobody had been asked.

The second property was worse in a different way. The dam on file matched a structure that no longer existed in that footprint. What was there now was roughly double the surface area, with a new spillway cut on the downhill side and a header line running off to a pump shed that definitely postdated the licence. The paper trail said one thing. The ground said another. That's the gap this job lives in.

By the third property I'd stopped being surprised and started doing the arithmetic. Three properties picked at random off a complaints log, all three off the register in some way, meant the other forty in the catchment were anyone's guess. Nobody had looked, because the register only gets updated when someone applies, or when someone complains, or when an inspector happens to drive past and notice. None of those are a schedule. They're an accident with a form attached.

Ten years is the number that stuck with me. A system that only updates on request produces exactly this kind of gap: a dam built in a quiet year, on a property that never has a dispute with its neighbours, can sit unregistered indefinitely. Most of what I find on these audits is ordinary farm work: a header pipe run to catch overflow, a ring tank widened during a wet year when the extra storage made sense at the time, nobody thinking to ring the regulator about it in the middle of harvest. The paperwork just never catches up to the dirt.

What struck me driving home was how much of the audit budget gets spent finding the properties worth visiting, rather than visiting them. Three flagged sites took a full day, and two of them turned out to have real issues. If I'd had to drive the whole catchment on spec to find those two, it would have taken a fortnight, and I'd still be relying on whichever stretch of fence line happened to be visible from the road.

This is the part of the job that doesn't show up in the annual report: the register isn't wrong because anyone lied, it's wrong because updating it has always depended on someone volunteering the information. A yearly image of the catchment compared against the current licence file does the opposite. It doesn't ask the landholder to come forward. It shows you the gully that's holding more water than the file says it should, and lets you decide whether that's worth a visit before you've burned a day of fuel finding out in person. We've started running exactly that comparison as a standing layer over this catchment, and it's on the Farm Dam Detection landing page if you want to see how the candidate list gets built.

Next audit cycle, I'd rather start the morning already knowing which three gates are worth opening.

← Back to the blog